S M A R T   R E S O U R C E S   G R O U P

Strategic Mining.
Engineered Delivery.

Unlocking the value of the world's most critical mineral assets via patented structural engineering and proprietary platform delivery.

Request Briefing Our Advantage →
60+
Critical minerals on the
USGS 2025 strategic list
$13.5B+
Combined US + Canada
government capital backstop
100+
Identified global assets in
SMART's curated pipeline
The Thesis
The Scarcity Myth

Geology isn't the problem; access is. Global constraints are not a matter of scarcity — but of permitting and technical stagnation.

Critical minerals underpin industries worth trillions. Yet hundreds of billions in high-grade deposits sit stranded. The world's most valuable mineral assets are not missing. They are locked.

The SMART Advantage
A Patented, Mine-Proven Platform

Verified at Peñoles/Tizapa — one of the most demanding commercial mining environments in the world. DPM is not a concept. It is a field-proven engineering reality.

Zero Subsidence

Surface Integrity Guaranteed

Reinforced-concrete roof creates its own structural integrity — guaranteeing surface stability and removing every regulatory and ESG veto point above the ore body.

Near 100% Recovery

Off-Balance Sheet Reserve Capture

Traditional mining loses 25% of proven and probable reserves. SMART recovers nearly 100% of the ore — value not on anyone's current books, fundamentally rerating asset NPV.

200–300% Mine Labor Productivity Gain

Parallel Scaling

All 3 mining activities run in parallel vs. 10 sequential steps in traditional mining. Labor costs reduced 50–70%. Production can be easily scaled.

Zero Dilution

Pure Ore Extraction

Zero ore dilution means every tonne extracted is high-grade product — no waste rock blended in, no grade compromise, and no processing inefficiency.

ESG Master Key

Aquifer & Hydro Isolation

By maintaining rigid ground stability, the system prevents subsurface rock fracturing. This eliminates fracture zones that drain or contaminate local water tables.

Lower Capex

Compressed Revenue Clock

Top-down extraction begins immediately upon reaching ore. Mine as you go — development and production run simultaneously. 12–18 months to first revenue.

Field Validation
Proven at Peñoles / Tizapa

A 4-year, full-scale commercial trial at Industrias Peñoles S.A.B. de C.V. — Dowa Mining & Sumitomo Corporation joint venture — under the strictest environmental mandates.

200–
300%
Mine Labor Productivity Gain Verified vs. Legacy Methods
Peñoles / Tizapa Trial
Recovery Rate

95%+ resource recovery — safely extracts high-grade materials traditionally locked away in permanent safety pillars, bypassing the standard 70% room-and-pillar ceiling.

Surface Result

Zero surface subsidence achieved throughout the entire trial period under a fully engineered structural paste backfill system beneath the concrete canopy.

Water Table

Complete aquifer and hydrogeologic isolation. No fracture zones created. Zero contamination or drainage impact on local water tables.

Tailings & Waste Rock

Dry tailings and waste rock are 100% recycled and utilized as structural backfill directly underground. Zero surface tailings dam — eliminating capital expense, environmental liability, and permitting risk entirely.

Primary Target
European Tier-1 Gold

Western Europe's highest-grade undeveloped gold deposit — ESG-stalled for decades. Location confidential pending permitting.

Asset Metrics

1.65M oz Gold
@ 4.5 g/t

1.65M oz
Measured & Indicated Gold Resource (Undiluted)
4.5 g/t
Average Grade — High Margin Threshold
12–18mo
To First Revenue Once Permitting Finalized
~$100M
Initial Capex — partially self-funded by early production

Why It Has Been Stalled

  • Coastal proximity — regulators prohibit any water table risk
  • Surface landscape vetoed — open pit denied years ago
  • Legacy underground cannot guarantee zero subsidence
  • One of Europe's richest gold deposits — idle for decades

The SMART Unlock

  • Zero subsidence guarantees coastal water table integrity
  • Invisible footprint — neighbor-friendly, regulatorily approvable
  • Ore shipped to existing local mill — avoids $150M+ plant build
  • Early production cash flow self-funds a significant portion of capex
The Difference
Strategic Mining vs. Big Mining

The SMART Strategy: Resource Arbitrage Targeting Mid-Sized, High-Grade Assets the Majors Ignore.

Big Mining

The Legacy Model

  • Mega-projects — $500M–$5B+ capex
  • 5–15 years from discovery to production
  • High debt load — dilutive equity cycles
  • Lose 25% of proven and probable reserves
  • Surface disruption blocks permitting
  • ESG vetoes strand Tier-1 assets
  • Slow, bureaucratic, environmentally risky

SMART Strategic Mining

The SMART Advantage

  • Mid-sized assets — significantly lower targeted capex
  • 12–18 months to first production
  • Self-funding future projects — cash flow kills the dilution cycle
  • Near 100% ore recovery — bonus ore not on the books
  • Zero surface disruption — invisible footprint
  • ESG vetoes become competitive advantages
  • 200–300% mine labor productivity gain — production scales easily
Asset Pipeline
100+ Identified Global Assets

A curated pipeline of qualified deposits built over 20+ years. Assets no competitor can unlock.

Asset Mineral Region The SMART Unlock
★ European Gold Project Gold Europe Zero-subsidence extraction; local mill partnership
Twin Metals (MN) Cu / Ni / Co USA Closed-loop hydro-isolation — Boundary Waters protection
Gunnison (AZ) Copper USA Zero-subsidence replacing in-situ leaching; dry stack tailings
Hermosa / South32 (AZ) Zn / Mn USA Zero-subsidence extraction; air quality compliance
Copperwood (MI) Copper USA Sealed hydro-isolation; 0% liquid discharge into Lake Superior
Back Forty (MI) Au / Zn / Cu / Ag USA SMART underground extraction; dry stack tailings; river protection
Victoria Project (ON) Cu / Ni / PGM Canada Zero-subsidence; dry stack tailings; urban footprint management
Eagle's Nest (ON) Cu / Ni / PGM Canada Sealed hydro-isolation — zero discharge; delicate hydrology protection
Gravenhurst (ON) REEs Canada Zero-subsidence; sealed hydro-isolation — Ontario CMIF aligned
Morrison Lake (BC) Cu / Au / Mo Canada Sealed hydro-isolation — zero discharge into salmon watershed
Government Capital Backstop
$13.5B+ in Critical Minerals Financing

Both governments need exactly what SMART Mining unlocks. Non-dilutive debt at scale — activated by SMART's ESG unlock capability.

$1.5B+

Canada CMIF

Critical Minerals Infrastructure Fund (Federal), Critical Infrastructure Fund (Ontario), and Northern Ontario Heritage Minerals Fund. Up to $100M per project for provincial government applicants. Non-repayable contributions available for qualifying projects. Ontario mandate directly aligned with Gravenhurst and additional SMART pipeline assets.

The Team
World-Class Technical Foundation

Two critical founding roles remain open — both carry founding-level equity. Building with the team, not joining an existing company.

CG
Co-Founder & CTO
Charles Gryba, P.Eng.
Inventor — DPM / SMART Mining
  • Inventor & global patent holder — DPM system
  • 50+ years underground mining engineering
  • Discovered 3M oz Au Moneta Michaud deposit
  • Permitted 4 mines, started 2 mills
  • Mine-proven DPM at Peñoles — 200–300% uplift
  • TSX & TSX-V President/CEO — 25 years
Seeking
CEO
Open Role — Founding Equity
Chief Executive Officer
Technical CEO — Capital & Execution
  • Senior underground mining executive
  • Proven capital raising track record
  • M&A and project execution experience
  • Technical credibility + commercial crossover
  • ESG, permitting & stakeholder expertise
  • Motivated by founding equity & legacy
DB
Co-Founder & Project Architect
Daniel Byrnes
Commercial Strategy & Vision
  • Originated SMART Resources Group concept
  • ESG unlock & distressed asset thesis
  • Commodities/metals trader — institutional markets
  • Government backstop alignment — $13.5B
  • Capital markets & network coordination

The Minerals the World Needs Exist.

We have the Engine, the Track, and the Fuel. We are seeking the Titan.

Request Executive Briefing
Dan Byrnes  |  Project Architect / Co-Founder  |  518-424-1972